了解一下玻璃雨棚的施工要點(diǎn)

來源:http://ajuxfs.cn/ 日期:2022-08-01 發(fā)布人:
通常,玻璃采用雙層夾膠技術(shù),避免破碎、傷人。玻璃雨棚大多可多次重復(fù)使用,,安裝也方便快捷。在這里,就和小編一起了解一下玻璃雨棚的施工要點(diǎn)吧。
Usually, glass adopts double-layer glue technology to avoid breaking and hurting people. Most of the glass canopy can be reused for many times, which is environmentally friendly and easy to install. Here, let's learn about the key points of glass canopy construction with Xiaobian.
1、加工準(zhǔn)備和下料:根據(jù)施工圖放樣。放樣和下料時(shí)保證焊接收縮量和加工余量,根據(jù)放樣制作模板。鋼材下料前須進(jìn)行矯直,矯直后的偏差值不超過規(guī)范規(guī)定的允許偏差值,保證下料質(zhì)量。熱加工后型鋼先熱加工,冷卻后打孔,預(yù)埋鋼板及其他零件的切孔及防銹涂裝處理。
1. Processing preparation and blanking: setting out according to the construction drawing. Ensure welding shrinkage and machining allowance during setting out and blanking, and make formwork according to setting out. The steel shall be straightened before blanking, and the deviation value after straightening shall not exceed the allowable deviation value specified in the specification to ensure the blanking quality. After hot processing, the section steel shall be hot processed first, and then it shall be drilled after cooling. The hole cutting and anti rust coating treatment of embedded steel plate and other parts shall be carried out.
2、濟(jì)南雨棚輻射測(cè)量:根據(jù)土建高程基準(zhǔn)線測(cè)量預(yù)埋高程中心線,檢查預(yù)埋高程偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔調(diào)整處理方案,沿樓板外沿墨線確定預(yù)埋件頂標(biāo)高線。
2. Jinan canopy radiation measurement: measure the embedded elevation center line according to the civil elevation datum line, and check the embedded elevation deviation and left-right deviation. Sort out the results, determine the separation and adjustment treatment scheme of embedded parts, and determine the top elevation line of embedded parts along the ink line outside the floor.
3、預(yù)埋件安裝處理:確定預(yù)埋件安裝位置,鉆孔安裝。要求預(yù)埋件位置準(zhǔn)確,埋設(shè)牢固。海拔偏差在9mm以下,左右位移在20mm以下。
3. Installation and treatment of embedded parts: determine the installation position of embedded parts and drill holes for installation. The position of embedded parts shall be accurate and firmly buried. The altitude deviation is below 9mm, and the left-right displacement is below 20mm.
4、吊臂安裝焊接:吊臂安裝采用焊接,檢查焊接節(jié)點(diǎn),調(diào)節(jié)吊臂設(shè)計(jì)坡度,焊接準(zhǔn)確。準(zhǔn)確靠在一個(gè)懸架臂上后,安裝另一個(gè)懸架臂,準(zhǔn)確對(duì)位并點(diǎn)焊。然后,以這兩個(gè)懸臂為基準(zhǔn)引出懸臂的高、低標(biāo)高線,將剩下的懸臂各焊接一個(gè),焊接無縫鋼管。需要長(zhǎng)型鋼時(shí),須先焊頭進(jìn)行矯正。采用鋼型接頭時(shí),應(yīng)按設(shè)計(jì)要求刨除楞角,將接頭鋼與鋼板預(yù)埋件貼合,對(duì)接焊接應(yīng)在焊接兩端焊接引弧板。
4. Installation and welding of boom: the boom is installed by welding. Check the welding nodes, adjust the design slope of the boom, and the welding is accurate. After accurately leaning on one suspension arm, install the other suspension arm, align it accurately and conduct spot welding. Then, take the two cantilevers as the benchmark to lead out the high and low elevation lines of the cantilevers, and weld one of the remaining cantilevers to weld seamless steel pipes. When long section steel is required, the welding head must be corrected first. When steel joints are used, the edges and corners shall be planed according to the design requirements, and the joint steel shall be bonded with the steel plate embedded parts. For butt welding, the run on plates shall be welded at both ends of the welding.
5、玻璃雨棚校正檢查:懸臂安裝后,檢查現(xiàn)場(chǎng)連接部位的質(zhì)量。懸臂安裝質(zhì)量主要檢查懸臂垂直面垂直度;按壓在懸臂垂直面?zhèn)让妫粦冶燮露?。保證懸臂滿足設(shè)計(jì)的受力狀態(tài)和整體穩(wěn)定要求。
5. Correction and inspection of glass canopy: after cantilever installation, first check the quality of on-site connection parts. The cantilever installation quality mainly checks the verticality of the cantilever vertical plane; Press on the side of the vertical plane of the cantilever; Cantilever slope. Ensure that the cantilever meets the design stress state and overall stability requirements.
濟(jì)南雨棚
6、連接受力電纜:定位拉桿基準(zhǔn)線、標(biāo)高線,必要時(shí)安裝預(yù)埋件,焊接扶手。
6. Connect the stressed cable: locate the reference line and elevation line of the pull rod, install embedded parts and weld handrails if necessary.
7、不銹鋼玻璃卡爪安裝焊接:按設(shè)計(jì)尺寸彈出豎線和設(shè)計(jì)標(biāo)高,夾具夾緊,點(diǎn)焊定位,組裝完畢,焊接玻璃卡爪底座。
7. Installation and welding of stainless steel glass claw: pop up the vertical line and design elevation according to the design size, clamp, spot weld and position, and weld the glass claw base after assembly.
8、防銹涂裝處理:焊渣和飛濺物,在不銹鋼零件表面多次刷白漆進(jìn)行防銹涂裝處理。涂料和涂膜厚度應(yīng)當(dāng)符合設(shè)計(jì)要求或施工規(guī)范的規(guī)定。用肢形鋼內(nèi)側(cè)油漆涂不得滲漏。
8. Antirust coating treatment: remove welding slag and splash, and brush white paint on the surface of stainless steel parts for antirust coating treatment for many times. The coating and film thickness shall meet the design requirements or construction specifications. Paint the inside of limb steel without leakage.
9、橡膠玻璃加工制作安裝:根據(jù)設(shè)計(jì)要求結(jié)合實(shí)測(cè)尺寸確定玻璃尺寸,以及的水平、垂直位置,由廠家加工制作。安裝不銹鋼玻璃卡爪,臨時(shí)固定玻璃后,調(diào)整標(biāo)準(zhǔn)的橫、縱、面平整。偏差不得超過規(guī)定的偏差。
9. Processing, manufacturing and installation of rubber glass: determine the size of the glass according to the design requirements and the measured size, as well as the horizontal and vertical positions of the glass, which shall be processed and manufactured by the manufacturer. Install the stainless steel glass claw, temporarily fix the glass, and adjust it to the standard horizontal, vertical and plane flatness. The deviation shall not exceed the specified deviation.
10、調(diào)整檢查:點(diǎn)式玻璃進(jìn)行整體調(diào)整檢查,調(diào)整標(biāo)準(zhǔn)水平、垂直、平面。偏差不得超過規(guī)定的偏差。
10. Adjustment and inspection: carry out the overall adjustment and inspection of the point glass, and adjust the standard horizontal, vertical and plane. The deviation shall not exceed the specified deviation.
這里介紹了關(guān)于玻璃門施工要點(diǎn)的注意項(xiàng)目,我希望這些能幫到您。如果還有不明白的地方,可以在我們的網(wǎng)站http://ajuxfs.cn下面留言,我會(huì)盡快為你解答。
Here are the key points of glass door construction. I hope these can help you. If there is still something you don't understand, you can find it on our website http://ajuxfs.cn Leave a message below, and I will answer it for you as soon as possible.
此文關(guān)鍵詞:Array  Array  Array  Array  

閱讀/ Recommended reading

  雨棚的安裝因材料、設(shè)計(jì)、尺寸、安裝難度以及地區(qū)差異等因素而有所不同。以下是對(duì)不同材質(zhì)雨棚安裝的詳細(xì)分析:  The installation price of a ca...

推拉蓬定制要注意什么? 2024-12-13
濟(jì)南雨棚的安裝要注意 2024-12-11
停車棚是一種用于停放車輛的簡(jiǎn)易式人工構(gòu)筑物 2024-12-03
活動(dòng)雨棚遮陽棚 2024-12-05

魯公網(wǎng)安備 37010302000864號(hào)

欧美日韩亚洲人妻| 精品国产欧美一区二区最新| 欧美精品123区| 久久久久久久紧深| 男人和女人的靠比视频网站| 亚洲成av人无码不卡影片| 日韩精品久久无码中文| 久久免费中文一区二区| 欧美在线一级| 青青av| 亚洲一区二区三区午夜福利欧美| 一级毛片高清免费| 欧美三级大黄片| 天堂男人精品| 无码一区国产二区| 激情小说区图片区| 国产精品欧美日韩视频一区二区| 亚洲天堂精品黄色片| 99热线中文字幕在线| 一区二区视频免费观看| 无码手机线免费播放三区视频| 天堂在线污| 欧美日韩换妻| 成人综合在线观看视频| 亚洲欧美日韩综合网站色aa| 亚洲AV片不卡无码一| 日韩一区黄色| 999高清无码在线| 熟女久久久久久| 少妇喷水视频网站| 软萌小仙自慰粉嫩小泬网站| 饶平县| 中文字幕无码日韩精品 | 成人国产欧美大片一区| 亚洲国产另类久久久精品极| 天天做天天做天天综合网| 99精品久久久中文字幕不卡| 亚洲午夜成人精品无码浴室| 免费精品在线视频| 成人毛片免费在线看| 国内精品久久久一区二区|